Best-in-Class Data Centre Build-Out

Case StudiesData Centres
1

Comprehensive Assessment and Planning

  • Thorough evaluation of the existing electrical systems.
  • Detailed project plan with clear timelines, cost estimate, and risk mitigation strategies.
2

Innovative Design and Engineering

  • Design-assist robust electrical system tailored to the data centre’s power requirements.
  • Seamlessly integrate new systems with the existing infrastructure.
3

Strategic Installation and Upgrades

  • Bus-duct, Transformers and Switchgear
    High-capacity units to handle increased loads
  • Distribution Panels
    New panels for efficient power distribution
  • Redundant Power Systems
    UPS and backup generators for uninterrupted power supply
  • Cooling Systems
    Power and connections for precision cooling and hot/cold aisle containment for optimal temperature management
  • Cable Management
    Structured cabling and cable trays for organized and efficient cable routing