Commercial Office Building Substation Replacement

Case StudiesDistribution Upgrades
1

Thorough Project Planning

  • Comprehensive assessment of the building’s existing electrical infrastructure and power needs.
  • A phased replacement plan was developed to minimize disruption, including scheduling work during off-peak hours and providing temporary power solutions to keep the building operational throughout the project.
2

Value Engineering and Design-Assist

  • Worked closely with the engineering team that designed a new substation tailored to the building’s specific needs, considering space constraints and the need for seamless integration with existing systems.
  • Selection of modern, energy-efficient equipment to reduce operational costs and enhance power reliability.
3

Regulatory Expertise

  • Managed the entire permitting process, ensuring that the project complied with all local and industry regulations to avoid delays and keep the project on track.
4

Safe and Professional Installation

  • Our highly-skilled installation team executed the project with precision, adhering to strict safety protocols to protect both workers and building occupants.
  • Rigorous testing and commissioning processes to ensure the new substation was fully operational and met all performance criteria.
5

Comprehensive Handover

  • After installation, provided training for the building’s maintenance team on the operation of the new substation including detailed documentation and ongoing support to ensure smooth future maintenance.